Navigation



Schematics: Cannon Assembly

UPDATE: 28 September 2010: Updated Schematics.
Schematic Information
Manufacture Skill335Production Skill325
TypeModuleTech Level10
Total Cost6,836,701Ship ComponentNo
Schematic XP3,836Finished XP9,729
Total Cost / Finished XP702
LocationUniversal Construction
Player Market Details
Current Amount Available: Average Cost Number of entries Links
NOT KNOWN ON PM
REQUIRED RESOURCES (including component resources)
RESOURCESQtyJoes PriceTotal Cost
Iridium2122,694571,128
Lithosite901,610144,900
Mesonite1412,877405,657
Prevtonium Ore1804,180752,400
Refined Ore2704,8071,297,890
Sinistronite1411,876264,516
Technesium2011,770355,770
Tellerite Ore1412,160304,560
Titanium1604,180668,800
Tungsten1025,290539,580
Water1,320745983,400
Xerinium Ore4201,305548,100
REQUIRED RESOURCES (Excluding component resources)
RESOURCESQtyJoes PriceTotal Cost
Refined Ore2704,8071,297,890
Technesium2011,770355,770
Tungsten1025,290539,580
Xerinium Ore4201,305548,100
All Components Required
NameQtyCon Cost
Medium Composite Barrel22,137,228
Triple Pulse Enabler31,958,133
Schematic Components Required
NameQtyCon Cost
Medium Composite Barrel22,137,228
Triple Pulse Enabler31,958,133
USED IN
Deathslinger

TREE (Printable/Popup)


This graph hard to read or you want to print it out? Click the link above to see it in a new page!

Version

V1.2B - Beta
KNOWN BUG: The tree at the bottom sometimes goes over the right panel. A fix is in progress.

You are not logged in, therefore the Comp Cost is set at Joes Buying Price Law Level 12

Login Here


Look For:


Items


Links